36 articles General

January 24/25 winter weather

 SCHEART repeaters will return to normal operation at 5:00 PM on Monday, January 26, 2026.  Thanks to everyone who supported agencies during this event. Update 1/23/2026: The SCHEART VHF/UHF repeater system will be linked to the main conference bridge today at 6:00 PM with the following exceptions: Conway UHF (equipment issue), Wallace UHF (Low Country…

Silent Key- K2KYJ

I am sad to announce that SCHEART lost a senior leader.  Gary Lennert, K2KJY, became a silent key on November 27, 2025.  Gary joined SCHEART in 2010 and became a driving force to enhance the analog repeater network and build out the DMR system.  He accepted the responsibility of coordinating deployable assets and frequently went…