Return to Normal Operations

08/04/2020 @ 7:14 AM – Isaias has exited the state leaving minimum damage to the communication infrastructure. The SCHEART system will return to normal operation at 0800 this morning.  Thanks to all the amateur radio operators who assisted agencies and hospitals during the event and to the operators who were standing by to help if needed.

KD4JQJ has written 130 articles